The Portfolio/Human Resources and Student System Systems

We will be restarting the Portfolio/Human Resources at 11:30 AM today (02/02/2010) to correct the performance issue we have been experiencing. We will be back up by 11:45 AM. Blackboard and Wesfiles are not affected by this change and can be reached by the URL’s below. https://blackboard.wesleyan.edu https:/wesfiles.wesleyan.edu

Portfolio Maintenance extended until 7:30 AM on January 26th

On Tuesday January 26, the Portfolio and database maintenance window will be extended by half an hour from 5-7AM to 5-7:30AM. Blackboard and Wesfiles will not be affected by this extension. They can be reached at: https://blackboard.wesleyan.edu https://wesfiles.wesleyan.edu Steve Machuga smachuga@wesleyan.edu

Wesfiles maintenance update

Wesfiles is still offline due to unanticipated difficulties encountered during the upgrade procedure. We expect to have the system back up by 4:30PM today. The upgrade problems were not evident during test upgrades of the Wesfiles system performed in preparation for today’s maintenance. The vendor of the software has been engaged throughout the process, but … Read more

Network outage for scheduled maintenance

There will be a 1 hour network outage on Wednesday, January 13, from 6PM to 7PM affecting the following buildings: Clark Hall 200 Church – dorm Alpha Delta North/south College Judd Olin Pac Allbritton Chapel Freeman Center for the Americas President’s residence This outage is to perform important hardware maintenance before the beginning of semester.

WESFILES UPGRADE DELAYS

Due to unforeseen problems with the update, Wesfiles is offline longer than we hoped. At this point, we think we will have it back online between 1:00 and 1:30 PM. We apologize for the delay of this notification while we determined the scope of the issue and timeframe to resolution.

Training Week of 1/11-1/15

Just a reminder that there are ITS training classes going on this week. There is still room in the classes and walk-ins are most welcome. Check out the topics and schedule at http://www.wesleyan.edu/training.

Jan 16 – Exley Power Shutdown

There will be a 4 hour power outage at the Exley Science Center and Science Library on Saturday, January 16, 2010 from 10 AM to 2 PM. The purpose is to program, commission and test the newly installed electrical equipment. We expect data and phone services to continue uninterrupted but precautions should be taken in … Read more