Posted in Uncategorized on Jan. 23, 2009 by admin
Student Gmail Move
Mail Forwarding
Please remember that if you had forwarded your Wesleyan email account, you must renew the forwarding process by following these instructions: http://googleapps.blogs.wesleyan.edu/how-tos/forwarding/
SPAM
Additionally, please check your SPAM mailbox for any missing emails. While we have taken precautions to avoid email going to your SPAM folder, we have heard reports that Wesleyan emails [...]
Posted in Uncategorized on Jan. 17, 2009 by jtaft
Update: As of 12:30 PM, the problems have been resolved. Peoplesoft and ePortfolio are now available.
Previous message: Problems with a database server are currently preventing logins to PeopleSoft and ePortfolio. We are working to resolve the problem. This page will be updated as more information becomes available.
Posted in Uncategorized on Jan. 17, 2009 by jtaft
The Dragon file server has been moved to new hardware. We expect that this will greatly improve stability. If you are having any issues with Dragon, please e-mail its@wesleyan.edu.
Posted in Uncategorized on Jan. 15, 2009 by admin
There is an electrical shutdown scheduled for SATURDAY, JANUARY 17, 2009 from 8:30 AM to 11:30 AM.
The following buildings will be impacted:
Fauver Field Residences
North College
South College
255 High Street
President
The data center will not be affected.
Posted in Uncategorized on Jan. 15, 2009 by admin
On Friday, January 16 between 9p and 10p we will be replacing our hardware that runs our Dragon file server with a virtual server. This will address numerous issues that have arisen over the last couple of months with Dragon’s performance. The cutover should take approximately 1 hour and files on that system will [...]
Posted in Uncategorized on Jan. 14, 2009 by admin
We will be failing over from our primary network load balancer to the secondary at 5PM this evening to implement a software upgrade on the load balancer. The switch should be transparent to users.
Posted in Uncategorized on Jan. 14, 2009 by admin
We are currently working on upgrading Dragon to new hardware to address recuring stability issues. We anticipate having Dragon upgraded by Tuesday, Jan 20th. Until then, we will be restarting Dragon every night at 7PM to improve stability in the short term. Files on Dragon will be unavailable for approximately 20 minutes during [...]
Posted in Uncategorized on Jan. 13, 2009 by admin
Jan 13 – At 7:00 PM Dragon will be restarted for system maintenance. Files on Dragon will be unavailable for approx 20 minutes.
Posted in Uncategorized on Jan. 7, 2009 by admin
Simple Posted Message
On Tuesday January 13th between 5:30 and 7:30 AM, we will be upgrading several Oracle Portfolio Applications. If you experience any problems with the applications listed below, please email its@wesleyan.edu.
The following applications will be upgraded: Financial Inquiry, Voyager/FRS Interface, Financial Planning Commitment Control, WSA Applications, Managers
Posted in Uncategorized on Jan. 6, 2009 by admin
There will be a brief interruption (circa 15 mins) for users logged in to condor on THU 1/8/2008. This maintenance is required in preparation for Saturdays maintenance work.